03/04/08 ZB Daily Pivots confusion


On the ZB, you show R1[124-05] higher than R2[122-18]?
There's a problem with the ZB calculations because of the change to half points. We'll try and get it fixed by this evening. In the meantime we've disabled those figures.
The ZB figures are fixed now. Although they still display as whole 32nds the underlying values include the halves and at some point in the future the display will be reformatted to include the halves.